Epoxy Floor Moisture Test
Planning ahead and installing a 10 mil reinforced moisture vapor barrier film before the slab is poured is a great first step toward avoiding eventual moisture issues in your epoxy flooring.
Epoxy floor moisture test. Ft then additional kits for every 2 000 3 000 sq. It is necessary to test your concrete for moisture before applying any coat of paint or epoxy on it. Testing moisture in concrete. Are placed on various areas of your floor as a single test on a large area cannot accurately determine moisture levels.
Additionally moisture under the concrete slab causes pressure that forces the epoxy to separate from the concrete s surface often taking pieces of concrete with it. Moisture testing per astm f 1869 calcium chloride test before installation of floor coverings on concrete substrates it is wise to test the rate of moisture vapor transmission mvt. Clean and dry the concrete floor. Flooring manufacturers rate their products based on the moisture levels they can tolerate and testing your slab can tell you if a particular flooring material is likely to perform adequately.
One way to eliminate epoxy floor coating failure is to test it before you coat it. It is not however the best test if you are planning to put an epoxy coating on the floor. Plastic sheet moisture test. Only then can you test properly for moisture using the following test methods.
Include a plastic sheet test which really is as simple as it sounds in your timeline so that you know the slab is truly cured and ready for the. The calcium chloride test is the only quantifiable test method which identifies the rate of moisture transmission within the concrete. A third option a simple diy test can indicate the presence of excess moisture either on the slab surface or in the room s air but it cannot measure. One test kit is normally used for the 1st 1 000 sq.
There are two tests that are typically used one is a calcium chloride test astm f1860 11 standard and the other is an in situ relative humidity test astm f2170 11. Excess alkalinity will eat epoxy coating causing it to bubble and split. Follow the steps outlined below to perform a moisture test prior to an epoxy floor installation. If there are any mortars grouts or adhesives they must be removed and ground down to expose a clean section of concrete.
This is a low cost low tech moisture test that can be useful for determining if you have moisture in a garage or basement floor. Avoid the problem by doing a simple moisture test to determine if the floor is right for an epoxy coating. Concrete is thick solid and hard. For those slabs with a pre existing floor covering an extra step is involved to test for moisture.