Epoxy Garage Floor In Sections
Keep the garage well ventilated throughout the application and initial curing.
Epoxy garage floor in sections. Finishing an existing garage floor with a new epoxy coating is a great way to refresh your diy workspace while also making the floor much easier to keep clean in the long run. Applying an epoxy coating to a concrete floor is as easy as painting walls but as with painting the success is in the prep work. Let the first coat dry overnight. Diy epoxy garage floor tutorial.
It not only provides a semi gloss finish but also provides resistance to chemicals impacts abrasions and even water. About applying epoxy in sections a diy guide on how to apply an epoxy garage flooring. How to do an epoxy floor in sections 4 mar 2019 in application tips tagged epoxy flooring by armorgarage in many cases your floor cannot be epoxied all in one shot due to too much stuff to move out or the floor had some repair areas done for lets say for new plumbing. Gray flannel epoxy garage floor coating with granite color flecks from quikrete.
This post is a part of a diy guide on how to apply an epoxy garage flooring. Repair chips and holes in the floor. Once the floor is properly prepared see how to prepare your floor for epoxy coating you would apply a good duct tape line to section off the floor. This approach is usually used if a single person applies the epoxy.
In most cases a garage floor can be divided into small sections. Then apply the second coat but stay back 6 12 from the tape line. Epoxy flooring consists of a resin part and a hardener part much like epoxy glue. Work in small 4 4 sections at a time.
Providing up to 200 square feet this epoxy floor coating is suitable for use on garage floors basements and workshops. If you use fresh mortar allow the repairs to cure for at least 60 days prior to recoating with epoxy. Regular garage floor paints are one part oil based or water based. This work will go quicker if you have a helper handling the cut in work.
Be sure to allow the proper times for light foot and vehicle traffic 1 and 3 days respectively. You can also make the repairs with epoxy patching. Work in 10 x 10 foot sections. Apply the first epoxy floor coat up to the tape line and let dry.
Do not use painters tape since our epoxy is too thick for that. Once applied it will take about a day to dry and about four days before it s ready for vehicle use. High quality epoxy floor paints are neither one part oil based nor water based and all epoxies are not the same and you need to know why so you don t have to do your floor a second or third time. Relax and have a cold one.